Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Abdul Nabi, M and El-adaway, I H (2022) A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Ahmad, R, Nauman, S and Malik, S Z (2022) Tyrannical Leader, Machiavellian Follower, Work Withdrawal, and Task Performance: Missing Links in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) Quantification of the State of Practice of Offsite Construction and Related Technologies: Current Trends and Future Prospects. Journal of Construction Engineering and Management, 148(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) The Impact of Offsite Construction on the Workforce: Required Skillset and Prioritization of Training Needs. Journal of Construction Engineering and Management, 148(07).

Brandalise, F M P, Formoso, C T and Viana, D D (2022) Development of a Typology for Understanding Visual Management Concepts and Their Relationships. Journal of Construction Engineering and Management, 148(07).

Chen, L, Zhang, J and Peng, W (2022) Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program. Journal of Construction Engineering and Management, 148(07).

  • Type: Journal Article
  • Keywords: Hierarchical discrete time-cost trade-off problem (HDTCTP); Program scheduling; Analytical target cascading; Multiproject management; Project scheduling;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002293
  • Abstract:
    In an environment of fierce market competition, companies commonly implement several projects simultaneously and employ programs to manage these multiprojects. The program is scheduled at the tactical layer to coordinate multiple projects, each scheduled independently by its project leader. The discrete time-cost trade-off problem (DTCTP) is one of the most significant project scheduling problems, and numerous studies have been conducted on DTCTP for several decades. However, there is still a notable gap in research on DTCTP in multiproject scenarios. A program is a popular approach for managing multiple projects that are related to each other. This paper proposes a new hierarchical discrete time-cost trade-off problem (HDTCTP) for the program that integrates the scheduling problems at the different layers. We clarify the interactions between different layers in program scheduling and introduce the model of a program cascading scheduling process. The program at the upper layer allocates budgets and targets to projects at the lower layer, where each project is scheduled independently. The scheduling results at the lower layer are fed back to the program for further coordination and optimization. This program iteratively coordinates, redistributes budgets, and assigns targets until the overall optimization is achieved. Then the HDTCTP is described and formulated based on analytical target cascading (ATC). To solve the presented HDTCTP, a top-down iterative algorithm is proposed according to the characteristics of HDTCTP in the frame of ATC. A real-life program case verifies the usability of the presented approach, and the results of experiments show that the presented algorithm based on ATC can efficiently solve the presented HDTCTP for programs.

Jayaraj, S, Doerfel, M L and Williams, T (2022) Clique to Win: Impact of Cliques, Competition, and Resources on Team Performance. Journal of Construction Engineering and Management, 148(07).

Khan, M, Khalid, R, Anjum, S, Tran, S V and Park, C (2022) Fall Prevention from Scaffolding Using Computer Vision and IoT-Based Monitoring. Journal of Construction Engineering and Management, 148(07).

Kim, S, Hwang, S and Son, J (2022) Safety Management Guidelines for Precast Concrete Production Plants Using Importance-Performance Analysis. Journal of Construction Engineering and Management, 148(07).

Li, Y and Ning, Y (2022) Mitigating Opportunistic Behaviors in Consulting Projects: Evidence from the Outsourced Architectural and Engineering Design. Journal of Construction Engineering and Management, 148(07).

Li, Y, Soomro, M A, Khan, A N, Han, Y and Xue, R (2022) Impact of Ethical Leadership on Employee Turnover Intentions in the Construction Industry. Journal of Construction Engineering and Management, 148(07).

Li, Y, Wang, J, Cao, L, Wei, D and Wang, Y (2022) Three-Step Mathematical Model for Optimizing Rebar Cutting-Stock with Practical Application. Journal of Construction Engineering and Management, 148(07).

Mahmoud, S, Hussein, M, Zayed, T and Fahmy, M (2022) Multiobjective Optimization Model for the Life Cycle Cost-Sustainability Trade-Off Problem of Building Upgrading Using a Generic Sustainability Assessment Tool. Journal of Construction Engineering and Management, 148(07).

Martínez Fernández, P, Villalba Sanchís, I, Insa Franco, R and Yepes, V (2022) Slab Track Optimization Using Metamodels to Improve Rail Construction Sustainability. Journal of Construction Engineering and Management, 148(07).

Mucheti, A S and Albuquerque, P J R d (2022) Influence of Execution Speed on Displacements of Soil-Nailed Structures with Vertical Face in Urban Areas. Journal of Construction Engineering and Management, 148(07).

Shi, M, Wang, J, Li, Q, Cui, B, Guan, S and Zeng, T (2022) Accelerated Earth-Rockfill Dam Compaction by Collaborative Operation of Unmanned Roller Fleet. Journal of Construction Engineering and Management, 148(07).

Shi, Q, Chen, X, Xiao, C and Han, Y (2022) Network Perspective in Megaproject Management: A Systematic Review. Journal of Construction Engineering and Management, 148(07).

Spearing, L A, Bakchan, A, Hamlet, L C, Stephens, K K, Kaminsky, J A and Faust, K M (2022) Comparing Qualitative Analysis Techniques for Construction Engineering and Management Research: The Case of Arctic Water Infrastructure. Journal of Construction Engineering and Management, 148(07).

Wang, X, Arditi, D and Ye, K (2022) Coupling Effects of Economic, Industrial, and Geographical Factors on Collusive Bidding Decisions. Journal of Construction Engineering and Management, 148(07).

Xiao, B, Wang, Y and Kang, S (2022) Deep Learning Image Captioning in Construction Management: A Feasibility Study. Journal of Construction Engineering and Management, 148(07).

Zhang, M and Ge, S (2022) Vision and Trajectory–Based Dynamic Collision Prewarning Mechanism for Tower Cranes. Journal of Construction Engineering and Management, 148(07).

Zhou, T, Zhu, Q, Shi, Y and Du, J (2022) Construction Robot Teleoperation Safeguard Based on Real-Time Human Hand Motion Prediction. Journal of Construction Engineering and Management, 148(07).